Tower precautions

May 20, 2025

Leave a message

Equipment hoisting should be smooth and not subject to impact;
The installation should be stable and firm, and the tower body should be vertical. In windy areas, the tower body should be strengthened;
The pipes connected to the equipment should avoid all their weight acting on the equipment pipes, and the tower top outlet pipes should be fixed;
It is recommended to install compensators when connecting the pipes and pipes;
When starting, the absorption liquid pump should be started first, the fan should be turned on, and the system should be entered after normal operation;
When the system is running, the water pump flow should be adjusted to prevent excessive or too small flow from affecting the use effect;
Pay attention to the water level at the bottom of the tower to prevent liquid from entering the air duct;
Prevent debris from entering the tower to block the channel and pipeline;
If the medium is sticky or sediment is attached to the tower, resulting in reduced treatment effect, the flange can be disassembled to clean the blades.